Showing posts with label metal saw. Show all posts
Showing posts with label metal saw. Show all posts

Saturday, December 03, 2011

Cami ... and welding!

No, Cami hasn't learnt to weld yet, but I thought I should mention my beautiful daughter and show her off to the world, at the same time as talking about the progress on my semi-automated brewing machine.

I have been on solo night duties for the past week as we are trying to get Cami settled into a sleeping routine and get used to settling herself back to sleep when she wakes rather than needing a feed from Emma. So waking at 2 or 3am and being up and down a few more times for the rest of the evening is taking its toll especially when you are busy at work. But I shouldn't complain as I have a very beautiful daughter and Emma has had to put up with the lack of sleep for the past 9 months (I did help her a bit on difficult nights but she definitely has had the lions share of sleep deprivation).

Anyway, here is a cute video of Cami on a lazy Saturday morning (a hungover one for Emma).

Anyway, regarding my brewing machine, I have achieved a bit this week but also had some setbacks. When Emma was out last night enjoying a night out with some of her fellow mums, I celebrated a night alone with a lovely sleeping Cami by enjoying some home brew whilst playing with power tools (always a good combination). I decided to drill the 22mm holes in the gas beam where the gas will come and be distributed to the different burners. I used a "step bit" for this task which is a lot easier than a large drill bit, but it is still bloody hard especially on 3mm thick stainless steel which is tougher than nails. So I managed to drill the holes which needs lots of lubricating oil on the bit as well as a slow speed to prevent the stainless from heating up and becoming so hard that it can't be drilled through. There is also a fair kick when the bit bites in to the metal ... luckily no spilt beer! So I managed to get all 4 holes drilled and enjoy a few home brews as well.

Here is the gas beam with the holes drilled.

Today I also managed to tack weld the top part of the frame together which is more difficult than it looks as you need to ensure everything is flush and square. Once it is all welded out there is no turning back so it is essential to get it right. Lots of G clamps, set squares, ratchet straps and leveling aids!

Here is a pic of the top frame when tacked together and also some video of me doing some of the tacks.

Maybe I can blame it on the lack of sleep, but I realized today that I actually cut the gas beam and the other long horizontal 20mm too short (pity it wasn't too long). Lucky I have sufficient spare steel tubing to be able to cut some more but will need to do this with my grinder and a cutting disc as I only hired the metal saw for 1 weekend. Oh well, not the end off the world but certainly a bit frustrating.

Till next time - cheers and beers!

Saturday, November 19, 2011

Brew system continues ...

Some progress has been made this week on my brew system. I have been doing a lot of extra research much to Emma's annoyance (welding methods and systems, welding gas types, where to get gas, welding wire selection, ways to flare a coupler into the keg, distance of burners from keggles, etc etc etc). It is really fascinating how much information is out there and how complicated you could make it if you wanted! I think the important thing I need to remember is that I am not building a space station so I need to come up with realistic yet robust systems for the brew setup. Saying that however, I have decided to improve on a number of features that other systems have out there and effectively take the best from the rest! But doing it in a reasonably straightforward way!

Anyway the main progress this weekend has been the cutting of all of the framework stainless steel. I hired a big metal saw from "the neighbour" (Naboen.no) which is a really cool rental place which has heaps of cool manly tools! I picked it up on Friday arvo and today got all of the cutting done. It was a very cool tool and managed to slice through the stainless like butter without imparting too much heat into it (which can ruin some of the stainless qualities). One of the improvements over other systems has been to mitre the top corners. This will give me a nice smooth top surface for the kegs to sit on, and it looks cool also. I also cut all of the legs, the support beams, and the second shelf frame work which includes the gas beam. I haven't started to weld it up yet but most of the hard work is done and the metal saw gave some really nice clean cuts as well (which should help a lot with good joint fit up during the welding process). I also cut some scrap sections where I can practice my welding on before hitting the frame itself.

One other improvement over some systems will be the ability to change my burner height. From what I have been reading there are many different opinions regarding how far away the burner tips should be away from the bottom of the kegs. So I have included a shelf system for the burners which will allow them to be adjusted reasonably easily (I.e. no welding required to change height).

The other good stuff that arrived this week was the two Honeywell pilot lights (I only need these on the automated burners under the HLT and MLT (the boil kettle is best to be manually controlled to maintain a rolling boil). I will install these into the adjustable shelf for the burners when I get the burners. I also received my neat little temperature controller (STC 1000). This allows me to set the target temperature of the HLT or MLT and then the STC 1000 sensor will measure the actual temp and if this is lower than target it will then open the solenoid valve to the burner and presto - the heat will go up.

The hired metal saw from Naboen

Some of the legs and horizontal supports

How the top of the brew system will look with the nice mitred corners

The front section and how it roughly goes together (if you have a good 3D imagination)

Some rough preliminary thoughts on how to mount the control panel

Will need some plate I can attach the electrical enclosure onto (food for thought)

These will form the basis for the adjustable height burners

Quick 3D autocad sketchup for confirming all the lengths for the cuts today

The pilot burners

The fancy digital temperature controller and sensor (I need 2 of these to control both HLT and MLT temps)